If you are deciding to knock down and rebuild from scratch, then undertaking the kitchen renovation process is not going to be an easy task. However, your kitchen renovation process can become overwhelming from planning out your layout to selecting benchtop materials and splashback designs.
Moreover, if you are a busy homeowner, then it becomes
uneasy to accomplish the kitchen renovation process efficiently. However, there
is a lot to think about from fixture to flooring when renovating your kitchen.
Here in this article, we are going to discuss all the kitchen renovation Toronto steps from start to finish
to ensure a smooth process with a great outcome.
1. Designing your space
Designing your space is the first step that you have to
accomplish when renovating your kitchen. It is vital to think about what you
want to achieve with your eating space. However, you can visit showrooms to
look at the new styles and designs. But make sure that you should look at the
real-life things rather than online to see the quality of the craftsmanship.
You have to call a kitchen designer if your renovation involves a new layout,
changing the plumbing and moving walls. Kitchen designers are the expert in
this field that will help you with the ergonomics of a kitchen and give advice
on the technical aspects.
2. Purchase fixtures, appliances and fittings
Now, this is the time for purchasing your appliances,
fixtures and fittings for your kitchen. Keep in mind that you have to choose
the device that can imply efficiently on your cabinets. Make sure to order the
fittings and fittings as soon as possible because it can take around five weeks
to arrive. However, it is the best time to decide on the material for your
benchtop and splashback. Therefore, make sure that you do not have to measure
and order these appliances after the cabinets installed to ensure they fit
perfectly.
3. Measure up
Measuring up is the most vital part in kitchen renovation
Toronto after your design is ready to go. However, the cabinet-maker will
measure up and provide working drawers for building the kitchen. Moreover,
these drawers also allow the layout of your plumbing and electrical provisions
to finalised. So while the kitchen is renovating, make sure to install these
trades efficiently.
4. Demolish the old layout
Now, this the time to demolish the old layout of your
kitchen after finalising the design and measuring up. Before starting the
process of destruction, make sure that everything ordered, lead times are
confirmed, and permits get concluded. However, if you are not changing the
layout of your kitchen, then allow 1-2 days for removing the old design and 2-3
days for rewiring and replumbing. The kitchen contractor will add walls,
windows, change plumbing and electricity after demolishing the old layout of your
kitchen.
5. Lay the floor
Flooring is the next step after demolishing
the old layout of your kitchen. However, if you are deciding to use concrete
floors, then lay it now because laying down these floors are a messy job. Make
sure to book the concrete flooring about four weeks in advance because it takes
about ten days to cure to a hard surface to work over. Keep in mind that laying
down the floor after the kitchen is complete is going to save your money.
Moreover, you are going to lock yourself into the layout by installing your
flooring after the kitchen. There is no flooring underneath the cabinets.
6. Installation
Now the renovators are going to build the kickboards,
position the cabinets and pre-position the appliances after the space are ready
to go. However, there will be a minimal wait time if the installation task gets
done efficiently. Moreover, some assignments, like installing an under-mount
sink, need a couple of days of drying time. Most of the cabinetry takes about
five days to install.
7. Connections
Now, this is the time for connecting all your
appliances, sinks, taps and lighting. However, this connection process can be
tricky and risky, so you have to consult electrician or plumber.
Moreover, before installing the benchtop, you have to
consult an electrician because some appliances can be tricky to access after
the benchtop go on.